We called Shane for a bid on a tub to shower conversion which required the installation of a new shower pan, new tile for the shower, new shower doors and water fixtures along with a safety/ADA bar so my dad can shower safely. The workmanship and quality is great, the job was on-schedule (we only had 6 days to get everything done) and made it with 2 hours to spare and most importantly, it was affordable. We will consider SH General Contracting for future needs & we highly recommend that you do the same.